VDB has agreed to provide a long-term credit of 662 billion dong for the 500 kV Quang Ninh–Mong Duong transmission line project. NPTC is the implementing agency for the project. The 25.2 km line will link the Mong Duong 1 and 2 thermal power plants to the national grid.