Patimban port in Subang, West Java, will be ready to cater to export-import activities in December 2020. Currently, Patimban Port is in the process of completing stage 1, that is, the completion of a 35 hectare container terminal with a capacity of 250,000 twenty-foot equivalent units (TEUs) and a 25 hectare vehicle terminal with a capacity of 218,000 CBUs. A vehicle pier with an area of 350m x 33m and a capacity of 218,000 CBUs is ready to be utilised. In 2021, the construction work will begin on a 66 hectare container terminal with a cumulative capacity of 3.75 million TEUs, a vehicle terminal with a cumulative capacity of 600,000 CBUs and a roll-on, roll-off  terminal covering an area of 200 metres.