A consortium comprising Voith Hydro Shanghai Ltd. and POWERCHINA Zhongnan Engineering Corporation has secured the core electromechanical equipment contract for the Bac Ai pumped storage hydropower project in Vietnam. The consortium has signed the contract with Vietnam Electricity (EVN), with Voith Hydro Shanghai acting as the consortium leader. The contract value and duration have not been disclosed.

Located in Khánh Hòa Province, the 1,200 MW facility will comprise four generating units, each with a capacity of 300 MW. Voith Hydro Shanghai will lead the supply of pump-turbines, motor-generators, and associated governor, excitation and control systems.

Bac Ai is Vietnam’s first pumped storage hydropower project and is included in the country’s Power Development Plan for 2021–2030, with a vision to 2050. The project is expected to strengthen the flexibility and reliability of the power system and support the integration of renewable energy. EVN is also planning further investments in power generation and grid infrastructure.