Thailand’s Transport Ministry has outlined 14 major infrastructure projects worth approximately THB362.6 billion to improve connectivity and support economic development in the southern region. A key initiative is the second phase of the southern double-track railway, valued at THB106.8 billion, covering 504 miles across three sections: Chumphon–Surat Thani (168 miles), Surat Thani–Hat Yai Junction (291 miles) and Hat Yai Junction–Padang Besar (45 miles). The Cabinet approved the project on September 1, 2026. The State Railway of Thailand (SRT) is preparing the bidding process, with contracts expected to be signed in 2027 and construction scheduled for completion in 2033.
Other proposed developments include the Andaman Ring Port across Phuket, Phangnga and Krabi, Hat Yai Ring Road, Phuket Expressway, a mainland expressway connection to Koh Samui and a mass transit system in Songkhla. Two projects nearing construction are a THB4.6-billion bridge across Songkhla Lake, linking Songkhla and Phatthalung, and a THB1.78-billion bridge connecting mainland Krabi to Koh Lanta. Contracts for both bridges were signed on August 31, 2026, with construction expected to begin following notices to proceed on November 14, 2026. Both are targeted to open in 2029. The Songkhla Lake bridge is expected to reduce travel distance by around 50 miles and cut journey times from nearly two hours to 15–30 minutes, while the Koh Lanta bridge will improve island access and emergency medical connectivity.