The Mass Rapid Transit Corporation Sendirian Berhad (MRT Corporation) has awarded three systems work packages worth RM 107.3 million for the MRT Sungai Buloh-Kajang line. A JV of AFS Engineering (M) Sendirian Berhad and ST Electronics Limited secured the RM 23.24 million contract for the supply of the SCADA system. Meanwhile, a consortium comprising Apex Communication Sendirian Berhad and Johnson Controls (M) Sendirian Berhad has won the RM 41.04 million contract for the engineering, procurement, construction, testing, and commissioning of the electronic access control system. Metronic Engineering Sendirian Berhad obtained the third work package for the supply of the building management system worth RM 43.04 million. All three contracts have been awarded for a period of 82 months. Thus far, the MRT Corporation has awarded 53 of the total of 85 works packages, with the remainder to be decided by end-2012.