Japan-based Mitsubishi Heavy Industries has delivered two of 25 two-carriage trains for the Sengkang-Punggol Light Rail Transit (LRT) line. These trains will be deployed in the third quarter of 2025. The delivery of the trains is expected to be completed by 2027, expanding the fleet to 33 two-car trains. These trains will replace 25 one-car trains and 17 two-car trains, some of which have been operational since 2003. Sengkang-Punggol LRT, operated by SBS Transit, covers 14 stations.