My Thuan Project Management Board has signed a contract with South Korea-based Kumho Engineering & Construction Company Limited for the construction of the Nhon Trach Bridge and its auxiliary roads in Vietnam. The 2 km bridge will be built over the Dong Nai River, while the connecting roads on both sides will be 560 metres long. The bridge project is expected to require an investment of over VND1,813 billion.

Once completed, it will reduce the distance from Nhon Trach district in Dong Nai to HCMC and Binh Duong Province.

The Nhon Trach Bridge project is part of the 1A component of the first phase of the Ring Road No.3 project covering the Tan Van – Nhon Trach section.