China-based Envision Energy has secured a supply contract to install 162 MW wind turbines in Alternergy’s Alabat and Tanay wind power projects in the Luzon region, Philippines.

The scope of the contract includes the designing, engineering, manufacturing, and delivery of wind turbine generators (WTGs) with a capacity of 6.5 MW and 8 MW each. Additionally, the contract also includes a 10-year-long service and maintenance agreement.

The projects are expected to be operational by the end of 2025. The partnership is in line with the country’s goal of achieving 50 per cent of energy transition by 2040.