The Saravane administration has appointed Intra Corporation and Inter Public Limited to conduct a feasibility study on the Sedon 2 hydropower dam project. The 15 MW project is expected to supply power not only to the local residents, but also to neighbouring countries. The feasibility study is likely to be completed in 18 months.