The Ministry of Transport has decided not to permit the development of new container ports at Ba Ria-Vung Tau, HCMC, and Dong Nai till 2015 because existing ports in the Cai Mep-Thi Vai area are operating below capacity. The actual throughput at the existing ports is about 16 per cent of the designed capacity.