The Hoang Anh Gia Lai Group is planning to sell six hydropower plants with a total capacity of 211.5 MW. The total investment of the six plants is about 4.2 trillion dong. Of the six projects, four plants are operational and two are expected to be completed in 2015. The power projects are the 80 MW Ba Thuoc 2 hydroelectric plant in Thanh Hoa province; the 24 MW Daksrong 2 hydropower plant in Gia Lai province; the 18 MW Daksrong 2A project, the 10 MW Daksrong 3A project, and the 19.5 MW Daksrong 3B project in Gia Lai province; along with the 60 MW Ba Thuoc 1 hydropower plant in Thanh Hoa province.