Halliburton has secured a multiyear contract from KS Orka Renewables to provide drilling and well construction services for two geothermal projects in Indonesia. The award covers multiple development phases at the PT Sorik Marapi Geothermal Power (SMGP) project in North Sumatra and the PT Sokoria Geothermal Indonesia (SGI) project in East Nusa Tenggara.
The scope includes directional drilling, cementing, drilling fluids and drill bit services to support geothermal well development. The two projects — SMGP in Mandailing Natal and SGI in Ende — are expected to deliver a combined installed capacity of 208 MW. Halliburton stated that the integrated drilling services are intended to improve operational efficiency and reduce development costs across the project lifecycle. KS Orka Renewables operates within a corporate group affiliated with Kaishan Group.