Historically, Vietnam’s energy system has relied heavily on coal, gas and hydropower. However, since 2020, Vietnam has made significant strides in diversifying its energy mix with a sharp increase in renewable energy capacity. Solar capacity (both utility scale and rooftop) grew from less than 0.1 GW in 2016 to 16.6 GW by the end of 2023. Similarly, wind power capacity expanded from 0.2 GW in 2018 to 5.6 GW by 2023. By the end of 2023, solar and wind together accounted for approximately 27 per cent of the total installed electricity capacity and the equivalent of nearly 14 per cent of total power generation. In support of the country’s NDC targets, the Power Development Plan for 2021-2030 (PDP8) was approved in May 2023. Although the PDP8 originally aimed for a modest amount of new solar capacity by 2030, discussions in February 2025 indicate this will increase significantly, with solar making up 45 per cent of all new capacity by 2030.
Renewable energy integration
The rapid development of renewable energy in Vietnam between 2019 and 2022 can be largely attributed to a highly favourable domestic policy environment. One of the key drivers was the introduction of attractive feed-in tariffs (FiTs) for solar and wind energy, which spurred significant investment in the sector. Starting in 2011, the Government of Vietnam introduced an FiT for wind power, which was increased in 2018 and included onshore, near shore, and offshore installations. From 2017, government decisions also offered FiTs for three types of solar installations: ground mounted, floating and rooftop. Additional favourable policies, such as lease exemptions, the absence of local content requirements and tax exemptions for renewable energy equipment further enhanced the competitiveness of renewable energy compared to fossil-based generation.
As a result, Vietnam added 11.6 GW of solar capacity in 2020 and 3.6 GW of wind capacity in 2021. This rapid growth in renewable energy was primarily concentrated in the South Central and Central Highlands regions due to high solar and wind potential, low population density and low land prices. However, this renewable energy capacity overburdened the existing grid infrastructure in these areas; the major load centres are located near the urban clusters of Hanoi (north) and Ho Chi Minh City (south), leading to a geographic mismatch. The transmission of renewable energy capacity from the south to the north is hampered by an ageing 500 kV transmission line that fails to support long-distance power transmission. Furthermore, as more distributed rooftop solar came online in December 2020, the distribution grid faced additional strain in some provinces. In 2020, approximately 364 GWh of solar energy was curtailed, resulting in significant financial losses and wasted power resources. By the end of 2023, the NLDC reported 20 overloaded points on the 220/110 kV transmission lines and transformers, along with 220 renewable energy plants that had to cut production due to grid congestion.
In addition to congestion, several technical challenges, such as limited renewable energy forecasting and a lack of support for ancillary services to stabilise frequency and voltage increased the pressure on EVN and its subsidiaries to manage and operate the grid effectively.
The FiTs for solar and wind applied to projects commissioned by end December 2020 and 2023 respectively. The lack of an alternative pricing mechanism after the FiT expiration contributed to a slowdown in renewable energy capacity additions that would sell to EVN. However, in July 2024, the Government of Vietnam issued a decree permitting direct power purchase agreements for renewable energy between private project developers and private energy consumers (including for privately developed transmission lines). This new legislation could spur a new wave of rapid renewable energy development in Vietnam.
Initial challenges and solutions
Vietnam’s success in rapidly expanding its renewable energy capacity has posed grid-related challenges due to several factors. Experts suggest that the lack of coordination between EVN and the Ministry of Industry and Trade (MOIT) and a lack of comprehensive planning from the MOIT resulted in these mismatches between energy generation and grid capacity. The national grid still requires significant investment to provide sufficient capacity for supply and demand requirements. Construction of new lines on the 500 kV grid has been relatively slow, and it is nearing full capacity. Only 78 per cent and 74 per cent of the planned 500 kV and 220 kV lines respectively were added to the system between the start of renewable energy expansion in 2016 and 2020, when renewable energy needed to be curtailed.
Due to regulatory, financial and institutional challenges, there was underinvestment in Vietnam’s grid infrastructure from 2016 to 2020. In 2019, the MOIT had an opportunity to address some of these issues through the first draft proposal for the second round of FiTs for solar power, circulated in February 2019. This draft suggested a zonal approach, where the provinces with the highest solar radiation and existing renewable energy capacity would receive the lowest FiT rates. The intention was to promote areas with less solar potential and capacity through a higher FiT rate. However, the final decision did not incorporate this zonal approach, leading to continued concentration of renewable energy projects in the same high-stress regions, aggravating grid congestion issues.
Another issue with power planning in Vietnam is the mismatch between provincial and national power development plans, particularly in the placement of substations, the direction of power transmission and the approval of project designs. The lack of co-ordination between the national government and provincial people’s committees creates delays and inefficiencies in upgrading the grid to accommodate existing and new renewable capacities, further contributing to grid congestion and curtailment issues. Investing in the grid is critical for Vietnam’s efforts to integrate and operate a modern electricity system with high renewable energy penetration. According to PDP8, the total investment required for the development of the grid from 2021 to 2030 amounts to $14.9 billion.
EVN has gained considerable experience in operating a grid with a high renewable energy share after 2019, particularly from solar and wind sources. During this time, the company has made significant strides in building its technical capacity to better manage the grid and ensure more efficient renewable energy integration. In addition, EVN has actively worked with the government and the National Assembly to enhance regulatory frameworks, paving the way for improved renewable energy integration into the grid. For example, EVN lobbied the government to allow private investment into the grid and the transfer of the grid assets to EVN. Furthermore, EVN was instrumental in the consultation for the amendment of the electricity law in 2024 to allow private investment in generation and the grid.
A key achievement has been the successful deployment of advanced technical solutions to manage renewable energy sources more effectively. The company has invested in information technologies, particularly to improve forecasting accuracy for solar and wind energy. For example, EVN National Load Dispatch Center developed an in-house forecasting model through collaborations with multiple data providers. As a result, the daily forecast error for renewable energy improved, and now consistently stays below 10 per cent, with global leaders aiming for 5 per cent to 10 per cent. Incentivising rooftop solar generators to provide a net production forecast could further improve overall forecast accuracy. EVN has also made substantial progress on grid modernisation, particularly by implementing a smart grid road map, across transmission and distribution. These advancements include improved metering, energy management systems and the deployment of supervisory control and data acquisition systems. These technologies enable EVN to monitor critical technical aspects of the grid, such as system inertia, voltage and frequency, ensuring stable grid operations and preventing failures.
Furthermore, according to experts interviewed, as of 2023, EVN had fully integrated 100 per cent of utility-scale renewable energy power plants into its automatic generation control system, allowing real-time grid management and control of generation outputs. The technical solutions implemented by EVN and its subsidiaries have dramatically increased the grid’s reliability and security. Additionally, EVN and its associated companies successfully ensured that 100 per cent of 100 kV substations were operating in compliance with fully automated operation procedures, with 79 per cent of 220 kV substations operating without any staff. EVN has taken steps to retain and retrain employees when substations are automated.
Beyond technical solutions for renewable energy management and forecasting, EVN has also invested heavily in upgrading physical grid infrastructure. In 2023 alone the company completed and operationalised 187 power grid projects, including substations and transmission grids. Notably, EVN successfully completed the installation of 519 km of the Quang Trach-Pho Noi 500 kV transmission lines ahead of schedule in 2024. This project received strong political support from the government as it aimed to prevent the northern part of the country from experiencing an electricity shortage like in the summer of 2023. In the future, EVN plans to improve grid operations by implementing customer net metering and demand response measures. Additionally, EVN is completing several 500 kV transmission and substation projects and has plans to develop high voltage direct current transmission lines to support the transfer of renewable energy capacity from southern to northern Vietnam.
Lessons learnt
Strengthening coordination with government and regulatory bodies: For state-owned power companies (SPCs), successful grid integration of renewable energy requires strong coordination between the utility, line ministries, local governments and regulators. EVN’s experience shows the importance of proactive planning that balances grid capacity and renewable energy potential in specific regions, as well as regulatory support for grid upgrades and new energy technologies. Interconnection with a cross-border transmission grid could help transfer surplus renewable energy to other countries.
Unlocking financing for grid infrastructure, including from the private sector: Access to international financing and government-backed guarantees is important to support grid expansion. However, SPCs should also work with governments to develop and implement policy mechanisms that can help secure commercial and non-sovereign loans, along with mechanisms to encourage private financing for grid development. Private capital constitutes an under-exploited resource, albeit one that presents challenges when it comes to financing transmission investments. Transmission or distribution subsidiaries, with separate financial systems and credit ratings, may find it easier to access commercial loans specifically for grid upgrades than the parent SPC.
Developing regulatory frameworks for renewable energy integration: Developing a market for grid services and offering attractive incentive policies, such as a pricing model for wheeling, could help attract private investment in grid infrastructure. Developing such a market as part of a successful energy transition requires regulatory support for market flexibility, ancillary services and energy storage. SPCs need robust policies that create conducive conditions for renewable energy integration, enhance grid flexibility and improve energy storage capabilities. This will help them manage the challenges of intermittent renewable sources like wind and solar.
Expanding smart grid and modernisation efforts: EVN has made significant progress in deploying smart grid technologies, much like other SPCs managing large, complex grids. The implementation of advanced monitoring systems, remote control capabilities and automation has enhanced efficiency. However, continued investment in both physical grid upgrades and digital infrastructure is necessary to accommodate growing renewable energy capacity and increased availability of information regarding network function.