The Government of Vietnam is preparing to develop fuel storage facilities, transfer stations and a pipeline in Nghe An province to supply gasoline and diesel to Laos, with the proposed infrastructure forming a cross-border energy corridor between the two countries. The plan includes storage capacity of 110,000–160,000 cubic metres and an approximately 80–100 km pipeline, which is expected to run along the Vinh–Thanh Thuy expressway corridor. The initiative aims to diversify Laos’ fuel imports, reduce its dependence on Thailand and strengthen regional energy security.
Under the plan, the main storage depot is being studied for locations in Hai Loc and Dong Loc communes, while the transit depot is proposed for Kim Bang and Dai Hue communes. The Nghe An Department of Industry and Trade is leading the location studies and must submit a preliminary plan by November 25, 2026. Relevant departments are expected to complete their technical reviews by November 20, while the Department of Finance has been tasked with completing investment procedures in 2026.
The project follows Vietnam’s adjustment of its national petroleum and gas storage and supply infrastructure plan for 2021–2030, with a vision to 2050, approved in October 2026. It also builds on a memorandum of understanding signed by Vietnam and Laos on gasoline and oil supply infrastructure during a bilateral visit in October 2026. The proposed corridor is intended to provide Laos with an additional fuel supply route while expanding Vietnam’s role in regional energy trade and strengthening the use of infrastructure in central Vietnam.