San Miguel Corporation (SMC) and Ayala Land Incorporation, a subsidiary of the Ayala Group have signed an integration agreement to connect ALI’s Arca South on and off ramps into the upcoming South East Metro Manila Expressway or Skyway Stage 4 project. Construction is expected to commence in 2024.
SMC Infrastructure is the concessionaire for the 32.66-km-long Skyway Stage 4, which will connect the Skyway system at the Arca South CDB to Batasan complex in Quezon City. Additionally, the expressway will provide an alternate route from the South to the Eastern of Metro Manila with interchanges at Ortigas Avenue Extension, Marcos Highway, and Tumana Bridge.
Further, the partnership will enhance transportation and future connectivity planned projects within Arca South, including the Taguig Integrated Terminal Exchange, North-South Commuter Railway and Metro Manila Subway Project.