Systra has secured the contract to prepare the preliminary design for the Bandar Utama-Klang light rail transit Line 3 (LRT-3), which is part of the Klang Valley Integrated Transit System in Malaysia. The scope of work includes design of viaducts, tunnels, depot and railway systems as well as rolling stock. The line spans 37.7 km and covers 26 stations, including 10 with park-and-ride facilities.